< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=2550434715461330&ev=PageView&noscript=1" />

Oil Tank

Custom Transformer Oil Tank for Oil-Immersed Power and Distribution Transformers

 

Transformer structural reliability begins with enclosure integrity. Jiangsu Yuantong Electric manufactures heavy-duty transformer oil tanks and custom steel enclosures engineered to house oil-immersed power, distribution, and special transformers. Built from certified structural steel plates with rigorous automated welding and leak-proof testing, our tanks provide airtight sealing, optimal thermal dissipation, and long-term corrosion resistance for global electrical OEMs.

 

 

Technical Specifications

 

Parameter

Specification

Applicable Transformer Capacity

10 kVA to 120 MVA classes

Material Grades

High-grade structural carbon steel, such as Q235B and Q345B, or corrosion-resistant alloy sheets

Steel Plate Thickness

3 mm to 20+ mm, customized according to structural stress and pressure rating

Pressure Withstand Limits

Vacuum and positive pressure test ratings compliant with applicable IEC/IEEE requirements

Surface Treatment Standard

Shot-blasting to Sa 2.5; multi-layer epoxy primer; weather-resistant polyurethane top coat

Corrosion Protection

C3 to C5 protection for industrial and marine environments

Compliance Standards

ISO 9001, IEC 60076, IEEE Std C57.12.00

 

 
Design and Construction
 

Tank structural performance dictates total preventability against oil leakage and mechanical distortion under fault pressures:

01/

Plate Cutting and Forming: Steel plates are processed using high-precision CNC plasma/laser cutting machines and hydraulic press brakes to ensure exact dimensional repeatability and edge alignment.

02/

Welding Technology: Main seam welding utilizes shielded metal arc welding (SMAW), submerged arc welding (SAW), or automated gas-shielded welding performed by certified operators to eliminate internal porosity, slag inclusion, and micro-cracks.

03/

Sealing Gaskets and Flanges: Joint surfaces are machined flat with precision groove designs utilizing high-grade oil-resistant nitrile rubber (NBR) or fluoroelastomer gaskets to guarantee zero-leakage performance under extreme thermal cycles.

04/

Lifting and Base Reinforcement: Integrated with heavy-duty base channels, jacking pads, and reinforced lifting lugs designed to withstand dynamic rigging loads during transit and installation.

 

Oil Immersed Transformer Tank

 

Applications

Oil-Immersed Distribution Transformers: Pole-mounted, pad-mounted, and substation units deployed in urban and rural power grids.


Power Transmission Substations: Large step-up and step-down power transformers operating at 35 kV, 66 kV, 110 kV, and higher voltage classes.


Renewable Energy Generation: Inverter-adjacent transformer units for utility-scale solar farms and onshore wind turbine substations.


Industrial Heavy Equipment: Specialized rectifying and furnace transformers operating in steel mills and chemical plants.

 

Manufacturing and Quality Control
 

Structural integrity is verified through a rigorous sequence of fabrication and inspection checkpoints:

Raw Material Inspection

Ultrasonic thickness testing and mill certificate verification for incoming steel plates to ensure uniform metallurgical quality.

Automated Fabrication Lines

Dedicated corrugated fin production lines and robotic welding stations ensuring consistent weld penetration and uniform wall thickness.

Surface Preparation and Coating

Multi-stage chemical cleaning, phosphating, airless spray priming, and baked polyurethane finishing to achieve optimal paint adhesion and salt-fog resistance.

Dimensional Verification

Laser measurement systems checking overall footprint, mounting hole spacing, and bushing turret locations against engineering drawings.

Custom Transformer Solutions

Geometric Adaptation

Non-standard height, width, or length profiles designed to fit restrictive substation spaces or specialized vault dimensions.

Accessory Integration

Customized placement of cable boxes, pressure relief devices, Buchholz relay flanges, oil sampling valves, and thermometer pockets.

Environmental Hardening

Special anti-corrosion paint systems for offshore platforms, heavy chemical industrial zones, or extreme desert solar sites.

 

 

Testing and Documentation

Every oil tank undergoes strict quality verification prior to surface coating and dispatch:
Routine Fabrication Tests (Performed on 100 percent of units):
Seam weld leak detection (pressure testing with dry air or nitrogen)
Vacuum test for rigidity and permanent deformation check
Liquid penetrant testing (PT) or magnetic particle testing (MT) on critical welded joints
Paint film thickness and adhesion cross-cut testing

 

Documentation Package: Includes certified dimension check sheets, weld inspection records, material test reports (MTR), and surface coating quality reports.

110-220kV Oil Immersed Transformers

 

Packaging and Delivery
 

Packaging

Tanks are cleaned, sealed with blanking plates or protective covers on all flange openings to prevent ingress of moisture and foreign debris, and secured on heavy-duty fumigated wooden skids.

Lifting and Handling

Equipped with standardized lifting lugs and forklift channels for safe loading, unloading, and crane positioning at client assembly facilities.

Shipping

Flexible shipping arrangements including open-top containers, flat-rack containers, or break-bulk vessel transport, supported by complete export clearance documentation.

 

FAQ

 

Q: What is the standard lead time for custom transformer oil tanks?

A: Production lead times typically range from 3 to 6 weeks depending on design complexity, plate thickness specifications, and order volume. Detailed schedules are provided with each quotation.

Q: How do you prevent oil leakage at welded joints over long-term operation?

A: We combine automated deep-penetration welding techniques with mandatory 100 percent pressure and leak testing. Flange faces are precision-machined, and high-elasticity oil-resistant gaskets are utilized to maintain sealing integrity across wide temperature variations.

Q: What anti-corrosion standards do you support for coastal or harsh industrial environments?

A: We offer multi-layer heavy-duty coating systems complying with ISO 12944 standards (C3, C4, or C5-M classifications), utilizing zinc-rich epoxy primers and polyurethane topcoats tailored to specific atmospheric corrosivity levels.

Q: Can you manufacture oil tanks based on custom client 3D drawings or CAD files?

A: Yes. We accept client-provided CAD drawings, STEP files, or detailed engineering sketches. Our engineering team reviews specifications for structural feasibility before entering production.

Q: What non-destructive testing (NDT) methods are used on critical welds?

A: Depending on project requirements, we utilize magnetic particle testing (MT), liquid penetrant testing (PT), and ultrasonic testing (UT) on high-stress welded seams to verify structural soundness.

Q: How are tank openings protected during international sea freight?

A: All pipe connections, valve flanges, and transformer cover openings are sealed with heavy-duty metal blanking plates or bolted rubber gaskets, accompanied by desiccant packets inside the tank to prevent internal moisture accumulation during transit.

As one of the most experienced oil tank manufacturers and suppliers in China, we also support customized service. Please rest assured to wholesale bulk high quality oil tank in stock here from our factory. Contact us for more details.

oil tank, Oil Immersed Transformer Tank, Transformer Tank

(0/10)

clearall